Thanks a lot, @Miner
You are right about the interpretation of the AQL table but my friend would like to do the inspection not to reject/accept the whole batch but to agree with the supplier on a number of extra pcs that will be added with the shipment after the inspection (based on an...
Hello Everyone :-)
My question concern Quality control. I would like to estimate the number of defectives pieces on the total quantity of my order based on the result of defectives pieces on my sampling. Sampling size is based on the "Acceptance Quality Limit" (AQL Level II).
Example 1...